Showing posts with label traffic. Show all posts
Showing posts with label traffic. Show all posts

Wednesday, 26 November 2014

One Way Traffic?

We've just received our parish magazine, and it appears that our illustrious local council has submitted comments at AVBC - on the proposed extra 58 rabbit hutches, oops dwellings (along with the 60 already passed) - for a recommendation of a one way traffic system, using Bridge Street AND Dean Street - ahhh, bless, they'll have to be disturbed - to relieve traffic issues.

Well, they won't take any notice of my comments - they never do - so fingers crossed they WILL take notice of our parish council ...

Monday, 8 November 2010

Asda At Langley Mill Is Open

What a chaos! The traffic is as bad as it was with the traffic lights - during the roundabout construction - with cars backing up to Heanor and Eastwood. Mini-fights [well, severe finger wagging] in the car park when someone parks in someone else's space. There are community police down there, presumably to try to direct traffic and calm things down. Attendants trying to advise people where there's a space to park ... AND THERE ARE ASDA SHOPPERS PARKING ON BRIDGE STREET when we were promised they wouldn't need to.

Get a grip people, Asda will still be there tomorrow ... and the day after ...

Friday, 3 September 2010

Langley Mill's New Roundabout

Oops, sorry neighbour. I wrote this and forgot to publish ... bad blogger.

I've just been told by a very reliable source [my good friend and neighbour] that:
  1. The footpath on Bridge Street is to open on Monday.
  2. Asda's roundabout should be fully open Tuesday or Wednesday, depending on the weather for laying tarmac.
  3. The turning circle/private car park will remain until RG Group leave in 7 weeks.
  4. There's a big fence going up along the new footpath.
Photos will be taken [and inserted] when we return home on Wednesday - hopefully using the new roundabout ...

.......................................................................

8th September Update:
  1. Yes the footpath to the bridge is open. Nets will be reinstalled on my windows [oops] -  I'll put my nets back up
  2. No, Asda's new roundabout isn't fully open ... I can only assume that if they were depending on the weather for tarmac laying [as some of us were told], then they must be using the 'don't like fresh air' variety of tarmac.
  3. BT is still very much in evidence at the end of Cromford Road, shall we blame them and their chamber?
  4. The fence is huge, almost as high as my bedroom window, I don't like it Asda - move it!

Monday, 2 August 2010

Back Home To Large Piles and Big Jams


Well, we've had mountains on the front and now we have hillocks on the back. It seems that RG Group are yet again rearranging piles of earth and now stashing them behind us - which means that as well as construction noise on the front, there's 'let's unload this and shove it here' noise [from before 7.30am] on the back, it's relentless - bleep-bloody-bleep - it's as bad [if not worse] as when H-effin-H and their pain-in-the-arse buddies were here!

So, as a complete change from living in the middle of a scrap yard, we now live in the middle of a building site whinge, whinge, moan.


They've now put the sides on the Asda building, it's not what you'd call pretty - yet, and my view of the back end of Netto has gone, I'm really, really sad about that - not. But, oh boo hoo, there's hardly any trees to be seen.


We went shopping to Eastwood on Saturday and when we came back were astonished to see the queue of cars trying to get onto the bypass. The queue extended as far as I could see down Upper Dunstead Road [as we flashed past at 30mph]. I have to wonder if people had been made aware that anything van sized or less could get out of the bottom of Cromford Road [turning left] all weekend. We noticed that there wasn't much traffic coming our way so can only assume that it was either a brand new idea or a big secret.

Having since been that way around whilst visiting friends, the fact that Cromford Road was open had obviously been Langley Mill's best kept secret - or a mistake - as the signs still stated that Cromford Road was only open at peak times of 5.30pm - 9.30am - and the road was indeed closed again this morning. Tut, still a case of nobody telling anybody else what's going on - and I can't be relied upon to relay information because ... well, I'm unreliable at the best of times ...

Tuesday, 20 July 2010

Langley Mill's Temporary Road Diversions

Go to www.asdalangleymill.co.uk/home for their latest update on traffic management [and a link to a nice little map]. Asda clearly lay the blame for the inept TM system at the door of Derbyshire County Council. They also say the roadworks will last for 8-10 weeks.

And before Asda and RG Group think they're getting off scot free in this latest moan; they can think again. Why have they decided to start work most days from 7.15 in the mornings, instead of the Council guidelines of 8.00am - or is this just a case of tit for tat with the council?

Oh dear ... RG Group have now passed through 'noisy gits' status and are hovering between the 'pains in the arse' and 'ignorant sods' categories - tut tut, they have slipped a long way down in my 'considerate to the community' ratings - and they were doing so well a couple of months ago

I suppose to be honest, I'd be a little more peeved at the early morning noise if I'd actually been at home listening to it myself. But seeing as we left Langley Mill for our tin hut by the sea at 5.30am on Monday July 5th - oops ... before my traffic updates [ha ha] - I'm obviously writing this in sympathy for my friends and neighbours who have had to put up with Asda's construction noise all day, every day ...

Tuesday, 6 July 2010

Langley Mill's Traffic Management Improvements - Thanks To Our Wonderful COUNCIL

And if you believe that title you'll believe anything.

There was a moderate improvement this morning, people were able to get out from the bottom of Cromford Road, round the lights at KFC/Lidl and back through Langley Mill, rather than having to add to the queue at Lower Dunstead Road [info courtesy of my neighbour, who also makes all the phone calls].

Things were also quieter getting onto the bypass from Aldercar [info courtesy of June]. Let's hope this continues. As she also says, people were probably leaving home earlier so journeys were staggered rather than everyone bogging down the crappy diversion system at the same time. This could have been done from day one if people had been properly made aware.

The council really were not interested in sorting out this mess, Langley Mill has always been regarded with an 'Oh it's only Langley Mill, it doesn't matter' attitude by the council, probably down to our industrial past and our Nottinghamshire postcode - I'm all for dragging the border back a bit and jumping counties.

It's only down to RG Group's construction manager that any improvements have been made at all - and these concessions were grudgingly given.

Trent Barton - the information on your website is still back to front as to which way is straight through Langley Mill.

I really must do some work now or I won't be able to afford to pay my council tax ...

Monday, 5 July 2010

Update on Langley Mill's 'Minimal Delays'

Right, first of all:

It's no use blaming Asda or RG Group for the traffic chaos in and around Langley Mill, although you're free to do so if you like, but it seems their hands are tied by 'them what know better' - Highways Agency or Derbyshire County Council, as the work is their responsibility [or so I've read].

Apparently there may be a couple of concessions made regards the end of Cromford Road being opened at peak times - I only say 'may'.

Things should be improved at the bottom of Dunstead Road regards parked cars causing an obstruction, cones have been placed and the owners offered alternative parking.

Other than that, things remain the same mess ... Remember Eastwood to Heanor - direct route, Heanor to Eastwood - interesting detour. Cromford Road etc - hard luck - no bus - no escape - start digging a tunnel.

I was peeved about my lack of residents newsletter, I know they often arrive dated the day after the job commences but this was a biggy for everyone concerned. Apologies have been made and accepted so we're happy again. Just as long as we get our newsletter at the top of the street first next time - and printed on watermarked paper with gilt edging.

You know, I think it's time I stuck to my day job and left this to someone else - someone who is paid to know what they're talking about. Rather than little old me - a lovely, sweet, grumpy lady ... All right, own up - who just called me 'a nosy old bag' ? ...

Gridlock In Langley Mill

'Slight' and 'Minimal' impact on journey time - my arse!

Langley Mill has now been brought to a standstill ...

From what I understand - I may be wrong, it did happen once before - hmm, oh, years ago now - DERBYSHIRE COUNTY COUNCIL took the decision to use the current method of traffic management through Langley Mill against advice after the traffic surveys were done.

I've heard reports of people taking an hour and half round trip to get children to school. North, Ebenezer and Thompson Streets were being used as shortcuts because of the gridlock at the bottom of Lower Dunstead Road, but this has now been stopped.

3/4 hour trip from Eastwood to Heanor - supposedly straight through, 20 minutes from half way up Mansfield Road to Lower Dunstead Road. Not good is it councillors, I do hope you weren't passing through Langley Mill on your way anywhere.

Did anyone at any point in this crass TM decision making consider the emergency services and how they'd get through Langley Mill? Flashing lights and sirens are next to useless in a gridlock.

I've just found out ASDA and RG GROUP, that whatever idle sod you sent with the residents newsletters the other day to tell us about the roadworks - and no way out of Cromford Road onto Station Road - only got as far as 32 Bridge Street and didn't bother with us from 34-72.

So far, I've given nothing but praise for how well you've kept us informed on each phase of the works being undertaken, but this is clearly NOT GOOD ENOUGH!!

From what I've been told now, the council and RG Group are having a meeting to sort the chaos out. Why oh why don't you just let someone with some sense do it - like a woman?

Watch this space ...

Thursday, 1 July 2010

Asda Roadworks in Langley Mill


For the latest 2011 roadworks in Langley Mill, please follow this link.

I've seen varying time scales [1st June - 22nd September covers them all] and varying amounts of disruption for the coming??? roadworks in Langley Mill for the new Asda roundabout or BT's chamber underneath it ... er, whatever.

According to my sources - hey, I like that, makes me sound important - Langley Mill's roadworks are only classed as 'slight impact' and 'minimal impact' on journey times, so stop moaning.

From 5th July there is no through road beyond Wesley Street from Heanor, so I'm assuming they'd like everyone who wants to get through Langley Mill [and who doesn't?] to go up Dunstead Road - the sign telling us this bit of info is just before the traffic lights there - and then onto the A610 ... busy, busy, busy. 


And there's a sign saying no access onto Cromford Road from the Eastwood direction. It doesn't say anywhere down here that we can't get out at the end of Cromford Road onto Station Road [but probably not].

The grumpy old man has made enquires to see if there is still a way through from Cromford Road for pedestrians to the Post Office etc. [yeah, I think he meant bookies too], he was told that pedestrians would still be able to get that way.


I strongly suspect there may be another sign at the more nobby junction of Upper Dunstead Road and Cromford Road to tell passing motorists that we're closed to the rest of the world, but as mere peasants residents, we're left to guess at this bit. In fact the Asda TM information so far given is crap!

So, where was I, oh yes ...  to sum up, methinks there may be a bit of a one-way system in play [but I could be completely wrong]. You can go straight through from Eastwood to Heanor admiring the roadworks on the way. And have a nice long detour from Heanor to Eastwood, obviously Eastwood is in favour because they pay their road taxes on time [and have much better Christmas lights] while Heanor - er, probably doesn't.

No, really? You think? Nope, it's got absolutely nothing to do with which side of the road the roundabout is on, trust me ... 

Update from Trent Barton:

Station Road at Langley Mill will be closed in one direction from Monday 5th July for approx. 6 weeks. This will affect amberline, black cat and rainbow 1.
 
black cat and rainbow 1 buses running towards Eastwood will not be affected.  Buses running from Eastwood will divert at B&Q island via the A610 and Upper Dunstead Road where the normal route will be picked up after the traffic lights just before trent barton garage.
 
amberline will run to its normal route to and from Aldercar church, from the church buses will run in both directions via the A610.
 
We are really sorry for any inconvenience this may cause; the situation is clearly beyond our control.  Our team of drivers will do all they can to keep buses running on time.
 
Yes, at least they let people know where they can [anyone on their mailing list] - unlike some half-wits who expect us to guess - although ... ahem, the buses will be running in the opposite direction to everyone else according to the signs that are up.

Hmm, I'm just confused now - Ahh, bugger it! I'll walk ...

Thursday, 3 June 2010

Traffic Chaos In Langley Mill


Well if that's the best they can manage in Langley Mill with just a bit of a hole, then I hate to think what it'll be like when they do the roundabout for Asda. Everything came to a standstill today at about 6pm because the traffic lights were broken.

Traffic movement had already been slow most of the day with this bit of 'traffic management'. Backing all the way up to Heanor one way and Eastwood the other. Apparently traffic was being diverted [I did see the signs] through Langley Mill because of resurfacing work on Woodlinkin bypass.

Don't people in charge of highways ever communicate with each other? Surely they must have known there were going to be hold-ups in Langley Mill - seeing as Derbyshire County Council had approved the Asda TM [so it says in latest residents newsletter] - without diverting more traffic through our poor village/town.
 
Back to this evening ... The lights on Cromford Road stayed permanently on red, as did the ones from Heanor to Eastwood, the ones from Eastwood to Heanor remains a mystery to me as I wasn't nosy enough to venture that far but the good news is - the crossing lights not far away [usually disabled when traffic management is in force] were working perfectly ... and frequently, adding a little extra zing to the entertainment.

Needless to say there were some risks taken as people just couldn't sit waiting forever but there were the usual few twits who took the risk to extremes by hurtling along in the Eastwood direction at upwards of 50mph, it would only take a like minded person to do the same thing at the same time in the other direction for there to be an accident.
 
We did hear one screech but by then the journalist [yeah, right] in me had told the grumpy old man to get a move on - and we'd continued on our walk around the sights [sites?] of Langley Mill, taking in a close up view of the back of Netto and mere minutes later, another look at the scrap that makes up Heanor Haulage - so I could get to my beloved computer and keyboard.

Things seemed to be managing reasonably OK on that corner up to today without resorting to traffic lights, it was all coned off but maybe they had to give in because it was left turn only out of Cromford Road. The GOM witnessed two people in less than 2 minutes turning right, he was talking to the site manager at the time and he said that there'd be a smash at this rate.

Just to say that when I started writing this, er, newsflash? [drivel] it was still exactly the same down there. Everyone waiting on Cromford Road and mad dashes from either direction on Station Road [the time is at the bottom of this post].

We did see a policeman at one point, I'd have thought he'd have stayed somewhere on the bend near The Mill pub to try to direct traffic as everyone would be able to see him from there but he seemed to have disappeared.

As we continued on our way round we had a word with one of the Asda site men, he said he was waiting for an engineer to fix the lights. Common sense would have told anyone - well, any woman [and incidentally the GOM] - to move the cones further to one side as they weren't actually doing anything and to chuck the traffic lights into the river ...

Thursday, 20 May 2010

A Bit Of Traffic Management

We got our latest newsletter the other day from RG Group, this time telling us that traffic management on the corner of Station Road/Cromford Road was going to be put in place from 24th May for BT to do a bit of rearranging underground.


Apparently it'll last 4-5 weeks and they're using cones, with no mention of traffic lights so I don't know how much disruption this will cause. The last time I looked there were already cones on that corner - as the ground floors of the buildings were being 'gently' demolished - so we might not even notice ...